Reconstruction started from 2016 and was finished in 2020. We do everything oureslelves together with many other activities. House serves as an accommodation for residents - men, and also for the guests.

  • There is a clay plaster all over the house.
  • Heating is provided by heavy clay stoves with a hypocaust for the upper floor.
  • Ashrams on the floor are mostly wooden with a nice view of a whole farm.
  • Bathroom is fitted up with a hand pump.
  • Water heating is provided by special stoves in the bathroom (heating is put on in the evening and in the morning there will be a hot water).
  • Windows are larch and jamb.
  • Whole house is without any electricity.

 


House 3 - tiled stove 150 000 CZK
House 3 - wooden windows and doors 150 000 CZK
House 3 - new roof and loft 400 000 CZK
House 3 - bathroom 50 000 CZK
House 3 - clay plastering 25 000 CZK
House 3 - wooden flooring 40 000 CZK
House 2 - Temple room 30 000 CZK
House 2 - Kitchen 40 000 CZK
House 2 - Wooden windows 30 000 CZK
House 2 - others (corridor etc.) 30 000 CZK
Outside clay plastering of all three houses 30 000 CZK
House 2 - new roof 300 000 CZK

list of contributors

1.1.2021 Tomáš Hujíček 1 000 CZK
3.10.2020 Daniel Lang 1 000 CZK
5.9.2020 Jakub Zimmermann 8 000 CZK
11.8.2019 Juraj Hatlas 66 000 CZK
2.8.2019 Jan Odehnal 50 000 CZK
30.6.2019 Tomáš Čech (Džanmáštamí d) 50 000 CZK
31.5.2019 Tomáš Bernatík (Tripurári d) 100 000 CZK
31.12.2018 Různí sponzoři (2016 - 2018) 724 000 CZK